Glow Worm Coordinate Gas Fire Manuals In Pdf
• 221100C.08.98 Installation & Servicing Instructions T o b e l e f t w i t h t h e u s e r F o r u s e w i t h a s p e c i a l l y d e s i g n e d G l o w - w o r m B a c k B o i l e r U n i t o n l y FIRE G.C No. • All dimensions on diagrams are in millimetres (except as noted) Where no British Standards exist, materials and If this fire front is to be fitted to a Glow-worm back equipment should be fit for their purpose and of suitable boiler WITHOUT a combustion products discharge quality and workmanship. • Manufacturer’s instructions must not be taken as overriding statutory requirements. 1.4 Fire Front Location This fire front can only be fitted to a Glow-worm CE Mark 45/2 or 56/2 back boiler unit which itself has been The CE mark on this appliance shows compliance with:- installed in accordance with the Glow-worm Installation and Servicing Instructions. • 2 T y p e s o f I n s t a l l a t i o n a n d F l u e Note.
Refer to Section 2 in the Back Boiler Installation 13mm MIN book before starting. NON- COMBUSTIBLE MATERIAL 2.1 With Hearth. • 3 F i r e F r o n t P r e p a r a t i o n INSULATION CONTROL KNOB FLUE SPIGOT CASING TRIM FUEL COALS SUPPORT GRID BODY ASSEMBLY HEARTH CASING CASTING FIXING PACK INCLUSIVE OF BACK BOILER SENSING TUBE GLASS. Case 1845c skid steer problems. • 3 F i r e F r o n t P r e p a r a t i o n 3.2 Flue Spigot Assembly Note.
Flammable (except cryogenic fluids and liquefied petroleum gases). The system includes a manual- or automatic-actuating mechanism. Snakes or glow worms. On frequencies licensed to any public safety agency by the 'FCC' shall not be installed without prior coordination and approval of the fire code official. GLOWWORM FIRE FRONT RADIANT METRO BBU FF BACK BOILER. Glowworm Coordinate G & GF FF Gas Fire Thermocouple S900002 S202436. This Part Number Replaces S202436 Which Maybe Listed In Some Parts Manuals.
This is marked “Homeglow BBU”. FLUE SPIGOT Leave the fire front sitting in the base tray. Secure the spigot assembly to the fire front back with the self tapping screws provided, from the loose items pack, see diagram 3.3. • 4 E l e c t r i c a l W i r i n g 4.1 General 4.3 Testing The fire front electrical supply, 230V~50Hz, is taken Checks to ensure electrical safety should be carried out from the back boiler electrical control box. By a competent person.
• 5 I n s t a l l a t i o n 5.1 Positioning the Fire Front Remove the fire front from the base tray. FLUE Place the fire front onto the back boiler air duct, check COLLECTOR that the fire front spigot is central in the flue collector ASSEMBLY assembly, push into contact with the fire front fixing face, see diagram 5.1. • 5 I n s t a l l a t i o n 5.2 Gas and Electrical Connection JOINT (C) Place the tubing nut and olive, from the loose items pack, onto the prepared end of the gas supply tube, see diagram 5.4. • 6 L i g h t i n g a n d T e s t i n g a n d F i t t i n g I n t e r n a l P a r t s Remove the pressure test point screw and fit a suitable pressure gauge, see diagram 6.2. • 6 L i g h t i n g a n d T e s t i n g a n d F i t t i n g I n t e r n a l P a r t s 6.2 Internal Parts - Fitting COLOURED CAUTION.
Our intentions are not to harm EVEREST software company but to give the possibility to those who can not pay for any piece of software out there. If you are keeping the software and want to use it longer than its trial time, we strongly encourage you purchasing the license key from EVEREST official website. This release was created for you, eager to use EVEREST Ultimate Edition 5.50.2100 full and with without limitations. Our releases are to prove that we can! S everest ultimate edition serial key. This should be your intention too, as a user, to fully evaluate EVEREST Ultimate Edition 5.50.2100 without restrictions and then decide.
• 6 L i g h t i n g a n d T e s t i n g a n d F i t t i n g I n t e r n a l P a r t s Note: Refer to GLASS and GRID ARRANGEMENT Note: Refer to GLASS and GRID ARRANGEMENT L.H. • 6 L i g h t i n g a n d T e s t i n g a n d F i t t i n g I n t e r n a l P a r t s PIN FITS INTO HOLE. • 6 L i g h t i n g a n d T e s t i n g a n d F i t t i n g I n t e r n a l P a r t s Note: 'Coal 5' sits on top of 'Coal 4' at R.H.S. • 6 L i g h t i n g a n d T e s t i n g a n d F i t t i n g I n t e r n a l P a r t s 6.3 Heat Settings 6.4 Test for Clearance of Products Light the fire front as relevant part of Section 6.1.